Site-Name

Jordan DISI Water Project

Jordan DISI Water Project

Client

GAMA

Project Objective

To improve water circulation

Project Description

Baffle Curtains were prefabricated off site into manageable sizes. The baffles were fixed between the concrete columns and tensioned with flexible straps.

Products Involved

1.2mm FPA DWI approved, WRAS approved UPVC pipes, 316L stainless steel brackets and connection bar

Outcome

Baffle curtains installed in a quick cost effective way to meet project objective

Benefits

Minimised stagnation and mineral deposits

Date

August 2012

Completed Baffle Curtains