Norwest Holst

Project Objective

To line a two hectare retention pond.

Project Description

This 2 hectare balancing pond was created by the contractor in the low-lying area of the site and a clay bund constructed. The floor of the pond was lined with 12,000 m² of geomembrane and the whole installation then covered. A spillway was also installed on the top of the bund.

Products involved

Hardline geomembrane, covered by a 300g/m² needle-punched geotextile, with Armorloc supplied for the bund’s spillway.

Outcome

Disruption to the developer's complex plan of works minimised.

Benefits

A highly cost-effective solution; Speedy installation (2 days)

Project Summary

Products Used

  • Geomembranes
  • Erosion Control
  • Concrete Revetment
  • Geotextiles
  • Sustainable Urban Drainage Systems

Project Features

  • Lakes
  • Revetments
  • Attenuation

Project Nature

  • Large
  • Rapid response, Completed in 2004.

Another Water-Lines Solution


Call 0800 5878309